Site-wide Search

Electricity Sales Specialist

Intelligent Station Management Specialist

Program overview

Low-voltage Flexible-DC Pioneer Zone Construction Solution

Based on the construction background of "improving the utilization and upgrading the monitoring and management of distributed new energy", the solution promotes the microgrid to realize the efficient utilization of new energy in the local area and the nearby consumption of electricity, so as to realize the improvement of the operational efficiency of the new energy project.

Program Advantages

  • Intelligent peak-to-valley adjustment and frequency adjustment on the grid side. At the same time, it can realize dynamic reactive power compensation and improve power quality.
  • Peak and valley arbitrage on the user side and demand management. Charging during load valley, discharging in peak, reducing power tariffs: charging in valley time and discharging in peak time of the load, reducing capacity tariffs.
  • Demand-side response: Dynamic capacity enhancement can be charged and discharged according to scheduling instructions, enjoying power grid subsidies.
  • No electricity / weak electricity area renewable energy microgrid applications: the use of energy storage equipment, new energy generation equipment and flexible-DC equipment to build microgrids, power supply for remote or island areas, to realize multi-energy complementary self-generation and self-consumption for powerless area.
  • Industrial and commercial microgrids / PV storage and charging station, zero-carbon microgrid applications: the use of energy storage equipment, new energy generation equipment and flexible equipment to form the PV storage and charging integrated microgrid, which can be used to provide continuous clean energy for the DC or AC loads.

Program Architecture

Application Scenario

Construction of Low Voltage Flexible DC Demonstration Area